案例分享 | 海工平台压缩机噪声分析计算方法The first step of the study is to integrate the new compressor platform acoustic model on the existing main platform acoustic model. The model will incorporate:
The second step is to collect all the acoustic data related to the new compressor platform:
Most of the values will come from vendor data and VIBRATEC/CLIENT databases. The last step is to incorporate these data in the model. Depending on their size and behaviour, sources will be modelled as:
Study in detail The noise study’s aim is to anticipate the impact of the equipment and assess the noise levels in the platform area. Configurations to be studied will have to be agreed with CLIENT; e.g. Normal Production Phase/Emergency operations etc. The acceptance limits shall be determined with CLIENT. The acceptance limits shall be in accordance with:
The simulations will be used to:
When criteria are not met, modifications will be discussed with CLIENT. The final report will be issued in two revisions:
The final report will contain:
Example of a platform noise map |